DC Pools & Spas

Inground Pools in Brandon, MS

Inground Pools for Brandon homeowners, installed start to finish by our own crew.

5 Star Rated on Google100+ reviewsFamily ownedLatham authorizedFlowood shop
Pool excavation on a DC Pools jobsite in Mississippi

In the yard

Inground Pools in Brandon, MS

An inground pool is a construction project in your backyard, not a purchase that gets delivered. Excavators, a crane, several tons of spoil, plumbing, electrical and a concrete pour all have to happen in the right order in a space that was recently your lawn.

Brandon is inside the tight radius where DC Pools & Spas does its own excavation, crane set and deck pour rather than subbing any of it out. The shop is minutes away, so the same crew is on site start to finish.

Understanding that up front is the difference between a build that runs to schedule and one that discovers a problem on install day.

Most of our work still comes from word of mouth. Same family standards on every pool install.

Credentials

Licensed through the Mississippi State Board of Contractors, license 25203-MC. BBB accredited with an A+ rating since 2018. Home Builders Association and Rankin County Chamber members.

BBB A+ accreditedMississippi State Board of Contractors licensedHome Builders Association memberRankin County Chamber of Commerce member

Access Decides More Than the Catalog Does

The first question on any Brandon site visit is whether we can physically get in. The excavator needs a route, the crane needs a reach and a set-up pad, and the spoil from the dig has to go somewhere, either off site on trucks or regraded into the property.

A backyard that looks wide open from the patio door can be unreachable once you account for a fence line, a septic field, overhead service or a neighbor's tree canopy. We would rather find that out with a tape measure than with a crane on the clock.

I-20 and Highway 80 both run through Brandon, so shell delivery and equipment staging are a short run from the Flowood shop rather than a long metro loop.

Sequence: Dig, Base, Set, Backfill, Deck

The excavation is cut to the shell. Then the base is prepared and compacted, which is the least glamorous and most consequential step in the entire build: a shell set on a base that settles will tell you about it for twenty years.

The crane sets the shell in a single day. After that comes plumbing, backfill in lifts so the shell stays supported, equipment, electrical, and finally the deck pour. Water goes in, chemistry gets started, and we run the system with you before handing it over.

Weather moves this schedule and anyone who tells you otherwise has not built in Mississippi. What we commit to is telling you when it moves and why.

Levels, Drainage and Permitting Around Brandon

Where the waterline sits relative to the house matters, and so does where rain goes once a large area of lawn has become deck. We would rather solve that in the plan with grading and a drain than with a pump in year two.

Setback and permitting rules vary between the municipalities in this metro, and a pool is not a structure you can move afterwards. We handle that paperwork as part of the build. We work regularly around Ross Barnett Reservoir, Brandon City Park and Shiloh Park.

Planning the Surround Before the Ground Closes

Even if the outdoor kitchen, the pergola or the fire feature is a later phase, it is far cheaper to run conduit, gas and drainage while the ground is already open. Retro-fitting any of that through a finished deck is the expensive way to do it.

You get one written, itemized quote covering whatever is in scope, and financing is available through Lyon Financial.

Nearby

Call the office if your city is not listed yet. We work the full metro from the Flowood shop.

Also see Brandon pools or statewide inground pools.

Related

More from DC Pools & Spas

Cities

Service areas

Brandon, MSFlowood, MSJackson, MSMadison, MSPearl, MSRidgeland, MSClinton, MSVicksburg, MS
FAQ

Common questions

Can you get equipment into a Brandon backyard?

That is the first thing we check on the site visit. The excavator needs a route in, the crane needs reach and a set-up pad, and the spoil needs somewhere to go. We measure it.

How long does the whole build take?

It varies with access, weather and the surrounding work. You get a schedule attached to the quote, and we tell you when weather moves it.

Do you handle permits?

Yes. Setback and permitting rules vary across this metro and a pool cannot be moved afterwards, so that paperwork is part of the build.

Should I plan the deck and kitchen now or later?

Plan them now even if you build them later. Running conduit, gas and drainage while the ground is open costs a fraction of retro-fitting through a finished deck.

Don't know where to start?

Start Here
Call NowFree Quote

Get Your Free Quote